The ramp to southbound 45 is closed permanently. The ramp to Highway 45 southbound at Watertown Plank Road is now open. All on and off ramps at Highway 100 and I-94 are open.

January 29-February 7, 2016

Friday (1/29)

  • A lane will be closed 1/19 through 5:30am 84th St SB from Kearney St to O’Connor St for roadway construction.
  • There will be a full closure during the day 100th St NB from Orchard St to Maple St for temporary lighting installation (NOTE-bi-directional traffic will be maintained with a flagger or stop/yield signs).
  • There will be a full closure during the day 100th St NB from Madison Pl to Bungalow Pkwy for temporary lighting installation (NOTE-bi-directional traffic will be maintained with a flagger or stop/yield signs).
  • A lane will be closed during the day 76th St NB at Kearney St for electrical cabinet and lighting work.
  • A lane will be closed during the day Kearney St EB from 76th St to 70th St for electrical cabinet and lighting work.
  • A lane will be closed overnight I-41/894 NB at Greenfield Ave for placing barrier wall.
  • A lane will be closed overnight I-94 WB from Underwood Creek Pkwy to Elm Grove Rd for paving.
  • There will be a full closure overnight I-41 NB at Mayfair Rd for bridge demolition.
  • There will be a full closure overnight I-41 SB at Burleigh St for bridge demolition.

Saturday (1/30)

  • There will be a full closure overnight I-41 NB at Mayfair Rd for bridge demolition.
  • There will be a full closure overnight I-41 SB at Burleigh St for bridge demolition.

Sunday (1/31)

  • Only long-term closures in effect.

Monday (2/1)

  • A lane will be closed 5:30am through 2/4 84th St SB from Kearney St to O’Connor St for roadway construction.
  • There will be a full closure during the day 100th St NB from Orchard St to Maple St for temporary lighting installation (NOTE-bi-directional traffic will be maintained with a flagger or stop/yield signs).
  • There will be a full closure during the day 100th St NB from Madison Pl to Bungalow Pkwy for temporary lighting installation (NOTE-bi-directional traffic will be maintained with a flagger or stop/yield signs).
  • A lane will be closed overnight Greenfield Ave EB/WB over I-41/894 for temporary lighting installation. *contingency is Thursday 2/4

Tuesday (2/2)

  • A lane will be closed 2/1 through 2/4 84th St SB from Kearney St to O’Connor St for roadway construction.
  • There will be a full closure during the day 100th St NB from Orchard St to Maple St for temporary lighting installation (NOTE-bi-directional traffic will be maintained with a flagger or stop/yield signs).
  • There will be a full closure during the day 100th St NB from Madison Pl to Bungalow Pkwy for temporary lighting installation (NOTE-bi-directional traffic will be maintained with a flagger or stop/yield signs).
  • A lane will be closed overnight I-41/894 NB at UPRR for loading out deck slabs.
  • There will be a full closure overnight I-94 EB at HWY 100 for sign bridge installation. *contingency is Thursday 2/4
  • There will be a full closure overnight I-94 WB at 68th St for sign bridge installation. *contingency is Thursday 2/4
  • The Zoo Int S-E system ramp will be closed overnight for sign bridge installation. *contingency is Thursday 2/4
  • The Zoo Int N-E system ramp will be closed overnight for sign bridge installation. *contingency is Thursday 2/4

Wednesday (2/3)

  • A lane will be closed 2/1 through 2/4 84th St SB from Kearney St to O’Connor St for roadway construction.
  • There will be a full closure during the day 100th St NB from Orchard St to Maple St for temporary lighting installation (NOTE-bi-directional traffic will be maintained with a flagger or stop/yield signs).
  • There will be a full closure during the day 100th St NB from Madison Pl to Bungalow Pkwy for temporary lighting installation (NOTE-bi-directional traffic will be maintained with a flagger or stop/yield signs).
  • A lane will be closed overnight Greenfield Ave EB/WB over I-41/894 for temporary lighting installation. *contingency is Thursday 2/4
  • Lanes will be closed overnight I-41 NB/SB from Meinecke Ave to Burleigh St for barrier wall installation. *contingency is Thursday 2/4

Thursday (2/4)

  • A lane will be closed 2/1 through 9pm 84th St SB from Kearney St to O’Connor St for roadway construction.
  • There will be a full closure during the day 100th St NB from Orchard St to Maple St for temporary lighting installation (NOTE-bi-directional traffic will be maintained with a flagger or stop/yield signs).
  • There will be a full closure during the day 100th St NB from Madison Pl to Bungalow Pkwy for temporary lighting installation (NOTE-bi-directional traffic will be maintained with a flagger or stop/yield signs).

Friday (2/5)

  • A lane will be closed long-term 5am through late February 2016 84th St SB from Kearney St to O’Connor St for roadway construction.
  • There will be a full closure during the day 100th St NB from Orchard St to Maple St for temporary lighting installation (NOTE-bi-directional traffic will be maintained with a flagger or stop/yield signs).
  • There will be a full closure during the day 100th St NB from Madison Pl to Bungalow Pkwy for temporary lighting installation (NOTE-bi-directional traffic will be maintained with a flagger or stop/yield signs).

Saturday-Sunday (2/6-2/7)

  • Only long-term closures in effect.

Long-Term Closures

  • A lane will be closed HWY 100 entrance ramp to I-94 WB through TBD for metering issues.
  • A lane will be closed 84th St NB from Kearney St to O’Connor St 2/5 through late February 2016 for roadway construction.
  • There will be a full closure 84th St entrance ramp to I-94 EB from through mid-June 2016 for roadway construction.
  • There will be a full closure I-94 EB exit ramp to 70th St from through mid-June 2016 for roadway construction.
  • There will be a full closure Center St EB/WB from 112th St to 114th St through early September 2016 for bridge reconstruction.
  • There will be a full closure Bluemound Rd entrance ramp to I-41 NB through late November 2016 for ramp reconstruction.
  • There will be a full closure Fairview Ave EB from 118th St to 116th St through late 2016 for retaining wall construction (becomes one-way WB only).
  • There will be a full closure Wisconsin Ave EB/WB from 95th St to 97th St through late May 2017 for reconstruction.
  • There will be no access from the Watertown Plank Rd EB entrance ramp to I-41 SB to the Zoo Int N-E system ramp through Summer 2017 for roadway reconstruction.
  • There will be a full closure I-94 WB exit ramp to HWY 100 NB through late October 2017 for roadway reconstruction.
  • There will be a full closure I-94 WB exit ramp to HWY 100 SB (from I-94 WB and I-41/894 NB) through late October 2017 for roadway reconstruction.
  • There will be a full closure of the Zoo Int E-S system ramp through late November 2017 for ramp reconstruction.
  • There will be a full closure I-41 NB exit ramp to Bluemound Rd through late November 2017 for ramp reconstruction.
  • There will be a full closure Bluemound Rd entrance ramp to I-41 SB through late November 2017 for ramp reconstruction.
  • There will be a full closure Schlinger Ave EB/WB under I-41/894 through early Summer 2018 for project construction.
  • Hank Aaron State Trail will be closed to pedestrians from 94th Pl to Oak Leaf Trail through early Summer 2018 for project construction.

* Note that these closures are weather dependent and subject to change.

For more information on Zoo Interchange closures, visit the Wisconsin Department of Transportation website.