Construction Updates
Destination Zoo

Getting to the Zoo is easy using our updated driving directions.

The ramp to southbound 45 is closed permanently. The ramp to Highway 45 southbound at Watertown Plank Road is now open. All on and off ramps at Highway 100 and I-94 are open.

July 24-August 2, 2015

Friday (7/24)

  • Zoo Interchange Project
    • A lane will be closed 7/21 through 7/28 National Ave EB/WB at the I-894/US 45 exit ramp for signal work.
    • A lane will be closed during the day Moorland Rd NB/SB and Greenfield Ave EB/WB for signal work.
    • A lane will be closed during the day WIS 100 SB at Theo Trecker Way for utility work.
    • Lanes will be closed overnight US 45 SB from Burleigh St to North Ave for a traffic switch.
    • Lanes will be closed overnight US 45 NB at Bluemound Rd for barrier wall work.
    • The Zoo Int W-N system ramp will be closed overnight for barrier wall work.
  • US 45 Resurfacing Project
    • Lanes will be closed overnight US 45 SB from Good Hope Rd to Burleigh St for pavement marking work.

Saturday (7/25)

  • Zoo Interchange Project
    • A lane will be closed 7/21 through 7/28 National Ave EB/WB at the I-894/US 45 exit ramp for signal work.
    • A lane will be closed in the morning Beloit Rd NB/SB and Lincoln Ave EB/WB for mill and overlay.
    • Lanes will be closed in the morning HWY 100 NB north of Lincoln Ave for mill and overlay.

Sunday (7/26)

  • Zoo Interchange Project
    • The Zoo Int W-N system ramp will be closed 11pm through 8/3 for roadway construction.
    • A lane will be closed 7/21 through 7/28 National Ave EB/WB at the I-894/US 45 exit ramp for signal work.

Monday (7/27)

  • Zoo Interchange Project
    • The Zoo Int W-N system ramp will be closed 7/26 through 8/3 for roadway construction.
    • A lane will be closed 7/21 through 7/28 National Ave EB/WB at the I-894/US 45 exit ramp for signal work.
    • A lane will be closed during the day Moorland Rd NB/SB and Greenfield Ave EB/WB for signal work.
    • A lane will be closed during the day Elm Grove Rd NB/SB and Greenfield Ave EB/WB for signal work.
    • A lane will be closed during the day Sunnyslope Dr NB/SB and Greenfield Ave EB/WB for signal work.
    • Lanes will be closed overnight US 45 NB/SB from Center St to Burleigh St for barrier wall and crash cushion work.
    • Lanes will be closed overnight I-94 EB from 70th St to 68th St for barrier wall removal.
    • Lanes will be closed overnight US 45 NB at Bluemound Rd for roadway construction.
    • Lanes will be closed overnight US 45 SB at Wisconsin for roadway construction.
    • The Zoo Int N-W system ramp will be closed overnight for bridge decking.
    • There will be a full closure overnight I-94 WB at Hawley Rd for barrier wall removal.
    • The Stadium Int S-W system ramp will be closed overnight for barrier wall removal.
  • US 45 Resurfacing Project
    • A lane will be closed during the day Silver Spring Dr entrance ramp to US45 SB for sign work.

Tuesday (7/28)

  • Zoo Interchange Project
    • The Zoo Int W-N system ramp will be closed 7/26 through 8/3 for roadway construction.
    • A lane will be closed 7/21 through 3pm National Ave EB/WB at the I-894/US 45 exit ramp for signal work.
    • A lane will be closed during the day Moorland Rd NB/SB and Greenfield Ave EB/WB for signal work.
    • A lane will be closed during the day Elm Grove Rd NB/SB and Greenfield Ave EB/WB for signal work.
    • A lane will be closed during the day Sunnyslope Dr NB/SB and Greenfield Ave EB/WB for signal work.
    • Lanes will be closed overnight US 45 NB at Bluemound Rd for roadway construction.
    • Lanes will be closed overnight US 45 SB at Wisconsin for roadway construction.
    • There will be two 15 minute rolling full closures between 2am and 4am I-94 EB/WB at 72nd St for utility work.

Wednesday (7/29)

  • Zoo Interchange Project
    • The Zoo Int W-N system ramp will be closed 7/26 through 8/3 for roadway construction.
    • A lane will be closed during the day Moorland Rd NB/SB and Greenfield Ave EB/WB for signal work.
    • A lane will be closed during the day Elm Grove Rd NB/SB and Greenfield Ave EB/WB for signal work.
    • A lane will be closed during the day Sunnyslope Dr NB/SB and Greenfield Ave EB/WB for signal work.
    • Lanes will be closed overnight US 45 NB at Bluemound Rd for roadway construction.
    • There will be a full closure overnight US 45 SB at Watertown Plank Rd for a traffic switch.
    • There will be a full closure overnight I-94 EB at HWY 100 for a bridge decking.

Thursday (7/30)

  • Zoo Interchange Project
    • The Zoo Int W-N system ramp will be closed 7/26 through 8/3 for roadway construction.
    • A lane will be closed during the day Moorland Rd NB/SB and Greenfield Ave EB/WB for signal work.
    • A lane will be closed during the day Elm Grove Rd NB/SB and Greenfield Ave EB/WB for signal work.
    • A lane will be closed during the day Sunnyslope Dr NB/SB and Greenfield Ave EB/WB for signal work.
    • Lanes will be closed overnight US 45 NB at Bluemound Rd for roadway construction.
    • Lanes will be closed overnight US 45 SB at Wisconsin for roadway construction.
    • There will be a full closure overnight I-94 EB at HWY 100 for a deck pour.

Friday (7/31)

  • Zoo Interchange Project
    • The Zoo Int W-N system ramp will be closed 7/26 through 8/3 for roadway construction.
    • 84th St SB from I-94 to Honey Creek Pkwy reopens to two lanes by 3pm.
    • A lane will be closed during the day Moorland Rd NB/SB and Greenfield Ave EB/WB for signal work.
    • A lane will be closed during the day Elm Grove Rd NB/SB and Greenfield Ave EB/WB for signal work.
    • A lane will be closed during the day Sunnyslope Dr NB/SB and Greenfield Ave EB/WB for signal work.
    • Lanes will be closed overnight US 45 NB at Bluemound Rd for roadway construction.
    • Lanes will be closed overnight US 45 SB at Wisconsin for roadway construction.
    • The Zoo Int N-W system ramp will be closed overnight for bridge decking. *contingency is Saturday 8/1
    • There will be a full closure overnight I-94 WB at Hawley Rd for a traffic switch. *contingency is Saturday 8/1
    • The Stadium Int S-W system ramp will be closed overnight for a traffic switch. *contingency is Saturday 8/1
    • There will be a full closure long-term 11pm through late November 2015 I-94 WB exit ramp to HWY 100 for roadway reconstruction. *contingency is Saturday 8/1

Saturday (8/1)

  • Zoo Interchange Project
    • The I-94 WB zipper merge at 68th St switches from a right lane closure to a left lane closure by 8am. *contingency is Sunday 8/2
    • The I-94 WB exit ramp to 84th St reopens to traffic by 8am. *contingency is Sunday 8/2
    • O’Connor St WB from 82nd St to 84th St reopens to traffic by 8am. *contingency is Sunday 8/2
    • The Zoo Int W-N system ramp will be closed 7/26 through 8/3 for roadway construction.
    • A lane will be closed 7/21 through 7/31 National Ave EB/WB at the I-894/US 45 exit ramp for signal work.
  • US 45 Resurfacing Project
    • A lane will be closed in the morning US 45 NB from UPRR to Burleigh St for barrier wall repairs.

Sunday (8/2)

  • Zoo Interchange Project
    • The Zoo Int W-N system ramp will be closed 7/26 through 8/3 for roadway construction.
    • A lane will be closed 7/21 through 7/31 National Ave EB/WB at the I-894/US 45 exit ramp for signal work.
    • Lanes will be closed overnight US 45 SB from Center St to Burleigh St for equipment mobilization.
    • There will be a 5 minute rolling full closure between 3am and 4am US 45 SB from Center St to Burleigh St for equipment mobilization.

Long-Term Closures

  • Zoo Interchange Project
    • A lane will be closed HWY 100 entrance ramp to I-94 WB through TBD for metering issues.
    • A lane will be closed 84th St SB from I-94 to Honey Creek Pkwy through 7/31 for roadway construction.
    • There will be a full closure I-94 WB exit ramp to 84th St through 8/1 for ramp reconstruction.
    • There will be a full closure O’Connor St WB from 82nd St to 84th St through 8/1 for roadway reconstruction.
    • There will be a full closure O’Connor St WB from 70th St to 73rd St through early August 2015 for roadway reconstruction.
    • A left-turn lane will be closed 70th St NB at O’Connor St through early August 2015 for roadway reconstruction.
    • There will be a full closure US 45 SB exit ramp to Bluemound Rd through late August 2015 for ramp reconstruction.
    • There will be a full closure 70th St entrance ramp to I-94 WB through late Summer 2015 for ramp reconstruction.
    • A lane will be closed Oklahoma Ave entrance ramp to I-894/US 45 NB through late September 2015 for signal work.
    • There will be a full closure Adler St EB from 85th St to 87th St through late Fall 2015 for sanitary and water work (becomes one-way WB only).
    • There will be a full closure Adler St EB west of 87th St through late Fall 2015 for sanitary and water work (becomes one-way WB only).
    • There will be a full closure Chester St WB from 92nd St to Dixon St through late Fall 2015 for roadway construction (becomes one-way EB only).
    • There will be a full closure of the Zoo Int S-W system ramp through late November 2015 for ramp reconstruction.
    • There will be a full closure I-94 WB exit ramp to HWY 100 7/31 through late November 2015 for roadway reconstruction.
    • A lane will be closed I-94 WB at 68th St through mid-December 2015 for roadway construction.
    • There will be a full closure 92nd St NB/SB from Schlinger Ave to Dixon St through mid-December 2015 for bridge reconstruction.
    • There will be a full closure Bluemound Rd entrance ramp to US 45 NB through late November 2016 for ramp reconstruction.
    • There will be a full closure Wisconsin Ave EB/WB from 95th St to 97th St through late December 2016 for reconstruction.
    • There will be a full closure of the Zoo Int E-S system ramp through late November 2017 for ramp reconstruction.
    • There will be a full closure US 45 NB exit ramp to Bluemound Rd through late November 2017 for ramp reconstruction.
    • There will be a full closure Bluemound Rd entrance ramp to US 45 SB through late November 2017 for ramp reconstruction.
    • There will be a full closure Schlinger Ave EB/WB under I-894/US 45 through early Summer 2018 for project construction.
    • Hank Aaron State Trail will be closed to pedestrians from 94th Pl to Oak Leaf Trail through early Summer 2018 for project construction.
  • US 45 Resurfacing Project
    • There will be a full closure US 45 SB exit ramp to Capitol Dr through mid-August 2015 for safety improvements.
  • Pilgrim Road Project
    • There will be a full closure Pilgrim Rd entrance ramp to US 45 NB through late August 2015 for reconstruction.
    • There will be a full closure US 45 NB exit ramp to Pilgrim Rd through December 2015 for reconstruction.
    • There will be a full closure US 45 SB exit ramp to Pilgrim Rd through December 2015 for reconstruction.

* Note that these closures are weather dependent and subject to change.

For more information on Zoo Interchange closures, visit the Wisconsin Department of Transportation website.